CNC Machining Capabilities

Machining equipment, inspection resources, and facilities supporting precision parts from prototypes to production.

Capabilities

Key machining specifications

Typical project reference values
General machining tolerance±0.10 mm for non-critical metal features as a quotation reference; drawing tolerances take priority.
Precision feature tolerance±0.01 mm target for selected critical features, subject to material, geometry and process review.
Part size – millingAssessed from the drawing against machine travel, fixturing and tool access.
Diameter / length – turningAssessed from the drawing against chuck capacity, turning length and workpiece support.
Surface roughnessRa 3.2 µm as a general machined-finish reference; Ra 1.6 µm or finer on specified surfaces after review.
Lead time – prototypesAllow 7–10 working days for initial planning, after drawing approval and material availability.
Lead time – productionAllow 15–25 working days for initial planning; quantity, finishing and inspection affect the schedule.
Minimum order quantityPrototype enquiry from 1 piece; batch quantities and commercial terms confirmed in the quotation.

These are general enquiry and planning references, rather than verified machine limits or a delivery commitment. Final tolerances, dimensions, finish, quantity and lead time are confirmed after drawing review and stated in the quotation.

Equipment & production support

From engineering and prototypes to production.

The Prototype Center supports engineering review, prototype machining and small-batch development. The Production Site provides machining resources for batch production.

Prototype Center

Engineering review, prototype machining and small-batch development, supported by four- and five-axis machining and CNC turning.

8 CNC machines · 4 four-axis machining centers · 1 five-axis machine · 3 CNC lathes

EquipmentBrand / modelQty
Vertical machining center (4 axes)YOUHONG / YH-866V1
Vertical machining center (4 axes)YOUHONG / V102
Vertical machining center (4 axes)YOUHONG / 10601
CNC latheYOUHONG / YH-4603
Five-axis machining centerJCTC1

Production Site

Additional machining resources for batch production, including CNC turning, machining centers and mill-turn equipment. Production arrangements are reviewed for each project.

38 CNC machines · 9 machining centers · 22 CNC lathes · 7 mill-turn machines

EquipmentBrand / modelQty
Machining center (4 axes)鑫亚泰2
Machining center (5 axes)东台(台湾)3
Machining center (4 axes)台群1
Machining center (4 axes)乔鸿1
Machining center (4 axes)兄弟机(日本)1
Machining center (3 axes)乔峰1
CNC lathe捷程6
CNC lathe智来10
CNC lathe禾隆5
CNC lathe精弗斯1
Mill-turn machine禾隆6
Mill-turn machine捷程1

Production Site supporting equipment

Auxiliary equipment

  • Surface grinder — M230 × 1
  • Vertical polishing machine — CA10 × 1
  • Bench lathe — YB-32 × 1
  • Deburring machine — GB03 × 1
  • Cut-off machine — J3G3 × 2
  • Vibratory finishing machine — YC12 × 1
  • Conventional lathe — CZ6132A × 1
  • Polishing machine with dust extraction — MD3025 × 1
  • Conventional milling machine — M4H × 2
  • Handling robot — Y50 × 2
  • Sawing machine — GB4028 × 1
  • Handling robot — Y60 × 4
  • Tool grinder — MB302 × 2

Measuring equipment

  • Caliper — 三丰 × 6
  • Height gauge — 三丰 × 2
  • Micrometer — 三丰 × 1
  • Vision measuring system — 海克斯康 × 1

Machine travel and maximum workpiece dimensions are assessed during drawing review. Axis counts describe the listed configuration; simultaneous multi-axis operation is confirmed per project.

From prototype review to repeat production

  1. Drawing review

    Confirm material, critical features and inspection requirements.

  2. Prototype & process review

    Evaluate the machining approach and prototype results.

  3. Production preparation

    Confirm the approved drawing, process and quality requirements.

  4. Batch production & delivery

    Coordinate production, inspection and protective packaging.

Facilities

Inside the factory

Machining, inspection and packing areas.

Upload Drawing for Quote

Send your drawing, material, quantity and critical requirements for a project review.

Upload Drawing for Quote